This was the reconstruction of the current HDPE DN110 water mains in the total length of 648.3 linear m including reconnection of DN32 house service connections in the total length of 137 linear m and lining of the current DN300 stoneware sewer in the length of 169.5 linear m. The construction work also included the restoration of surfaces affected by the construction (asphalt roads, lawn areas and concrete surfaces).