The new construction of two interconnected structures – a one-storey structure of locksmith’s workshops and a four-storey utility structure. In the utility structure there are a loading reception, a laboratory and offices. The project included equipping the laboratories with laboratory furniture. The building is situated in a chemically aggressive environment and during the construction it was necessary to protect the outdoor constructions using special coating substances. The load-bearing construction of the structure is a reinforced concrete skeleton with perimeter brickwork on the first floor and with Kinspan panel cladding on the other floors.